Please use this identifier to cite or link to this item: https://doi.org/10.21256/zhaw-30440
Publication type: Conference paper
Type of review: Peer review (publication)
Title: A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times
Authors: Halman, Nir
Sedding, Helmut A.
et. al: No
DOI: 10.21256/zhaw-30440
Proceedings: Proceedings of the 19th International Workshop on Project Management and Scheduling
Conference details: 19th International Workshop on Project Management and Scheduling (PMS), Bern, Switzerland, 2-5 April 2024
Issue Date: 2-Apr-2024
Publisher / Ed. Institution: University of Bern
Language: English
Subjects: Time-dependent scheduling; FPTAS; K-approximation sets and functions; Monotone dynamic programming
Subject (DDC): 005: Computer programming, programs and data
658.5: Production management
URI: https://digitalcollection.zhaw.ch/handle/11475/30440
Fulltext version: Submitted version
License (according to publishing contract): Not specified
Departement: School of Engineering
Organisational Unit: Institute of Data Analysis and Process Design (IDP)
Appears in collections:Publikationen School of Engineering

Files in This Item:
File Description SizeFormat 
2024_Halman-Sedding_Faster-FPTAS-for-makespan-minimization_PMS2024.pdfSubmitted Version115.68 kBAdobe PDFThumbnail
View/Open
Show full item record
Halman, N., & Sedding, H. A. (2024, April 2). A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. Proceedings of the 19th International Workshop on Project Management and Scheduling. https://doi.org/10.21256/zhaw-30440
Halman, N. and Sedding, H.A. (2024) ‘A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times’, in Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. Available at: https://doi.org/10.21256/zhaw-30440.
N. Halman and H. A. Sedding, “A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times,” in Proceedings of the 19th International Workshop on Project Management and Scheduling, Apr. 2024. doi: 10.21256/zhaw-30440.
HALMAN, Nir und Helmut A. SEDDING, 2024. A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. In: Proceedings of the 19th International Workshop on Project Management and Scheduling. Conference paper. University of Bern. 2 April 2024
Halman, Nir, and Helmut A. Sedding. 2024. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Conference paper. In Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. https://doi.org/10.21256/zhaw-30440.
Halman, Nir, and Helmut A. Sedding. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Proceedings of the 19th International Workshop on Project Management and Scheduling, University of Bern, 2024, https://doi.org/10.21256/zhaw-30440.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.