Titel: A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times
Autor/-in: Halman, Nir
Sedding, Helmut A.
et. al: No
DOI: 10.21256/zhaw-30440
Tagungsband: Proceedings of the 19th International Workshop on Project Management and Scheduling
Angaben zur Konferenz: 19th International Workshop on Project Management and Scheduling (PMS), Bern, Switzerland, 2-5 April 2024
Erscheinungsdatum: 2-Apr-2024
Verlag / Hrsg. Institution: University of Bern
Sprache: Englisch
Schlagwörter: Time-dependent scheduling; FPTAS; K-approximation sets and functions; Monotone dynamic programming
Fachgebiet (DDC): 005: Computerprogrammierung, Programme und Daten
658.5: Produktionssteuerung
URI: https://digitalcollection.zhaw.ch/handle/11475/30440
Volltext Version: Eingereichte Version
Lizenz (gemäss Verlagsvertrag): Keine Angabe
Departement: School of Engineering
Organisationseinheit: Institut für Datenanalyse und Prozessdesign (IDP)
Enthalten in den Sammlungen:Publikationen School of Engineering

Dateien zu dieser Ressource:
Datei Beschreibung GrößeFormat 
2024_Halman-Sedding_Faster-FPTAS-for-makespan-minimization_PMS2024.pdfSubmitted Version115.68 kBAdobe PDFMiniaturbild
Öffnen/Anzeigen
Zur Langanzeige
Halman, N., & Sedding, H. A. (2024, April 2). A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. Proceedings of the 19th International Workshop on Project Management and Scheduling. https://doi.org/10.21256/zhaw-30440
Halman, N. and Sedding, H.A. (2024) ‘A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times’, in Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. Available at: https://doi.org/10.21256/zhaw-30440.
N. Halman and H. A. Sedding, “A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times,” in Proceedings of the 19th International Workshop on Project Management and Scheduling, Apr. 2024. doi: 10.21256/zhaw-30440.
HALMAN, Nir und Helmut A. SEDDING, 2024. A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. In: Proceedings of the 19th International Workshop on Project Management and Scheduling. Conference paper. University of Bern. 2 April 2024
Halman, Nir, and Helmut A. Sedding. 2024. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Conference paper. In Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. https://doi.org/10.21256/zhaw-30440.
Halman, Nir, and Helmut A. Sedding. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Proceedings of the 19th International Workshop on Project Management and Scheduling, University of Bern, 2024, https://doi.org/10.21256/zhaw-30440.


Alle Ressourcen in diesem Repository sind urheberrechtlich geschützt, soweit nicht anderweitig angezeigt.