Bitte benutzen Sie diese Kennung, um auf die Ressource zu verweisen:
https://doi.org/10.21256/zhaw-30440
Publikationstyp: | Konferenz: Paper |
Art der Begutachtung: | Peer review (Publikation) |
Titel: | A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times |
Autor/-in: | Halman, Nir Sedding, Helmut A. |
et. al: | No |
DOI: | 10.21256/zhaw-30440 |
Tagungsband: | Proceedings of the 19th International Workshop on Project Management and Scheduling |
Angaben zur Konferenz: | 19th International Workshop on Project Management and Scheduling (PMS), Bern, Switzerland, 2-5 April 2024 |
Erscheinungsdatum: | 2-Apr-2024 |
Verlag / Hrsg. Institution: | University of Bern |
Sprache: | Englisch |
Schlagwörter: | Time-dependent scheduling; FPTAS; K-approximation sets and functions; Monotone dynamic programming |
Fachgebiet (DDC): | 005: Computerprogrammierung, Programme und Daten 658.5: Produktionssteuerung |
URI: | https://digitalcollection.zhaw.ch/handle/11475/30440 |
Volltext Version: | Eingereichte Version |
Lizenz (gemäss Verlagsvertrag): | Keine Angabe |
Departement: | School of Engineering |
Organisationseinheit: | Institut für Datenanalyse und Prozessdesign (IDP) |
Enthalten in den Sammlungen: | Publikationen School of Engineering |
Dateien zu dieser Ressource:
Datei | Beschreibung | Größe | Format | |
---|---|---|---|---|
2024_Halman-Sedding_Faster-FPTAS-for-makespan-minimization_PMS2024.pdf | Submitted Version | 115.68 kB | Adobe PDF | Öffnen/Anzeigen |
Zur Langanzeige
Halman, N., & Sedding, H. A. (2024, April 2). A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. Proceedings of the 19th International Workshop on Project Management and Scheduling. https://doi.org/10.21256/zhaw-30440
Halman, N. and Sedding, H.A. (2024) ‘A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times’, in Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. Available at: https://doi.org/10.21256/zhaw-30440.
N. Halman and H. A. Sedding, “A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times,” in Proceedings of the 19th International Workshop on Project Management and Scheduling, Apr. 2024. doi: 10.21256/zhaw-30440.
HALMAN, Nir und Helmut A. SEDDING, 2024. A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. In: Proceedings of the 19th International Workshop on Project Management and Scheduling. Conference paper. University of Bern. 2 April 2024
Halman, Nir, and Helmut A. Sedding. 2024. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Conference paper. In Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. https://doi.org/10.21256/zhaw-30440.
Halman, Nir, and Helmut A. Sedding. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Proceedings of the 19th International Workshop on Project Management and Scheduling, University of Bern, 2024, https://doi.org/10.21256/zhaw-30440.
Alle Ressourcen in diesem Repository sind urheberrechtlich geschützt, soweit nicht anderweitig angezeigt.