Full metadata record
DC FieldValueLanguage
dc.contributor.authorAshworth, Simon-
dc.contributor.authorTucker, Matthew-
dc.contributor.authorDruhmann, Carsten K.-
dc.date.accessioned2018-09-27T06:10:53Z-
dc.date.available2018-09-27T06:10:53Z-
dc.date.issued2017-
dc.identifier.urihttps://digitalcollection.zhaw.ch/handle/11475/11104-
dc.description.abstractPurpose: To investigate the role of Facility Management (FM) in developing a client’s Building Information Management (BIM) strategy and Employer’s Information Requirements (EIR) to ensure client/user information requirements are fully captured in the BIM process. Design methodology and approach: BIM/FM related scientific literature and industry standards and guidelines were reviewed to establish key documents and terminology FMs should be familiar with prior to engaging in a BIM project. A questionnaire was then used to assess FMs level of understanding of the documents and terminology and a FM-BIM Strategy Model which makes reference to key standards and guidelines was developed as a concept to help facility managers (FMs) better understand and engage in the BIM process. Originality: A significant research gap was identified regarding FMs role in developing a BIM strategy and EIR at the start of the BIM process to align with the client’s Asset Management (AM) strategy. The FM-BIM Strategy Model outlines a process for co-creation with clients and other whole life stakeholders to prepare a BIM strategy and EIR based on a solid understanding of BIM standards, guidelines and tools. Findings: Most FMs have heard about the BIM process but few have a deep understanding or any practical experience. In order to deliver best value for clients guidance is required which is aimed at focusing specifically on what the FMs need to know to develop a client BIM strategy and EIR documents that can be used by all stakeholders in the creation of assets, buildings and infrastructure projects. The FM-BIM Strategy Model provides a useful reference which can be used for this purpose to help ensure the right information is received in the operation phase.de_CH
dc.language.isoende_CH
dc.rightsLicence according to publishing contractde_CH
dc.subjectFacility Management (FM)de_CH
dc.subjectBuilding Information Modelling (BIM)de_CH
dc.subjectEmployer’s Information Requirements (EIR)de_CH
dc.subjectAsset Information Requirements (AIR)de_CH
dc.subject.ddc658.2: Facility Managementde_CH
dc.subject.ddc690: Hausbau und Bauhandwerkde_CH
dc.titleThe role of FM in preparing a BIM strategy and Employer’s Information Requirements (EIR) to align with a client’s asset management strategyde_CH
dc.typeKonferenz: Paperde_CH
dcterms.typeTextde_CH
zhaw.departementLife Sciences und Facility Managementde_CH
zhaw.organisationalunitInstitut für Facility Management (IFM)de_CH
zhaw.conference.detailsEuropean Facility Management Conference 2016, Milan, Italy, 8-9 June 2016de_CH
zhaw.funding.euNode_CH
zhaw.originated.zhawYesde_CH
zhaw.publication.statuspublishedVersionde_CH
zhaw.publication.reviewNot specifiedde_CH
Appears in collections:Publikationen Life Sciences und Facility Management

Files in This Item:
There are no files associated with this item.
Show simple item record
Ashworth, S., Tucker, M., & Druhmann, C. K. (2017). The role of FM in preparing a BIM strategy and Employer’s Information Requirements (EIR) to align with a client’s asset management strategy. European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016.
Ashworth, S., Tucker, M. and Druhmann, C.K. (2017) ‘The role of FM in preparing a BIM strategy and Employer’s Information Requirements (EIR) to align with a client’s asset management strategy’, in European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016.
S. Ashworth, M. Tucker, and C. K. Druhmann, “The role of FM in preparing a BIM strategy and Employer’s Information Requirements (EIR) to align with a client’s asset management strategy,” in European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016, 2017.
ASHWORTH, Simon, Matthew TUCKER und Carsten K. DRUHMANN, 2017. The role of FM in preparing a BIM strategy and Employer’s Information Requirements (EIR) to align with a client’s asset management strategy. In: European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016. Conference paper. 2017
Ashworth, Simon, Matthew Tucker, and Carsten K. Druhmann. 2017. “The Role of FM in Preparing a BIM Strategy and Employer’s Information Requirements (EIR) to Align with a Client’s Asset Management Strategy.” Conference paper. In European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016.
Ashworth, Simon, et al. “The Role of FM in Preparing a BIM Strategy and Employer’s Information Requirements (EIR) to Align with a Client’s Asset Management Strategy.” European Facility Management Conference 2016, Milan, Italy, 8-9 June 2016, 2017.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.