Search


Results 1-15 of 15 (Search time: 0.015 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleInvolved Person(s)
2020Periodic timetabling with flexibility based on a mesoscopic topologyBütikofer, Stephan; Steiner, Albert; Wüst, Raimond
Dec-2019Generation of the transport service offer with application to timetable planning considering constraints due to maintenance workWüst, Raimond Matthias; Bütikofer, Stephan; Köchli, Joël; Ess, Severin
24-Sep-2019Maintenance timetable planning based on mesoscopic infrastructure and the transport service intentionWüst, Raimond Matthias; Bütikofer, Stephan; Ess, Severin; Gomez, Claudio; Steiner, Albert, et al
13-Sep-2019Improvement of maintenance timetable stability based on iteratively assigning event flexibility in FPESPWüst, Raimond; Bütikofer, Stephan; Ess, Severin; Gomez, Claudio; Steiner, Albert, et al
5-Sep-2019Periodic timetabling with flexibility based on a mesoscopic topologyBütikofer, Stephan; Wüst, Raimond Matthias; Ess, Severin
30-Aug-2019Periodic timetabling with ‘Track Choice’-PESP based on given line concepts and mesoscopic infrastructureWüst, Raimond; Bütikofer, Stephan; Ess, Severin; Gomez, Claudio; Steiner, Albert, et al
Jun-2019Improvement of maintenance timetable stability based on iteratively assigning event flexibility in FPESPWüst, Raimond Matthias; Bütikofer, Stephan; Ess, Severin; Gomez, Claudio; Steiner, Albert, et al
8-Oct-2018Development of a prototype for the automated generation of timetable scenarios specified by the transport service intentionWüst, Raimond; Gomez, Claudio; Ess, Severin; Steiner, Albert; Bütikofer, Stephan
4-Oct-2018Periodic timetabling with ‘Track Choice’-PESP based on given line concepts and mesoscopic infrastructureBütikofer, Stephan; Wüst, Raimond Matthias; Steiner, Albert
2018Periodic timetabling with ‘Track Choice’-PESP based on given line concepts and mesoscopic infrastructureWüst, Raimond Matthias; Gomez, Claudio; Ess, Severin; Steiner, Albert; Bütikofer, Stephan, et al
2017Kundenfreundliche und robuste Ersatzfahrpläne während Bau- und UnterhaltsintervallenWüst, Raimond Matthias; Steiner, Albert; Gomez, Claudio
2017The OpenTrack API : case study using opentrack for benchmarking automatically generated timetable scenarios specified by the transport service intentionWüst, Raimond Matthias
2017Chancen für die urbane GüterlogistikSchmelzer, Helene; Wüst, Raimond Matthias
2013RTSE, a multi-component closed-loop control framework for railway networksWüst, Raimond; Steiner, Albert; Looser, Jonas; Seybold, Bernhard; Laumanns, Marco, et al
2013Mehr Kapazität dank innovativem BahnbetriebWüst, Raimond Matthias
Results 1-15 of 15 (Search time: 0.015 seconds).
  • previous
  • 1
  • next