Please use this identifier to cite or link to this item: https://doi.org/10.21256/zhaw-3478
Publication type: Conference paper
Type of review: Editorial review
Title: Infrastructure asset management: better decision making by using "Value of Time"
Authors: Steinegger, Rolf
DOI: 10.21256/zhaw-3478
Proceedings: Congress Proceedings
Volume(Issue): Abstract No 16.4
Page(s): 708
Pages to: 715
Conference details: World Congress on Railway Research, Edinburgh, Scotland, 28 September - 1 October 2003
Issue Date: 2003
Publisher / Ed. Institution: WCRR
Language: English
Subjects: Life-cycle-cost; Railway; Infrastructure
Subject (DDC): 380: Transportation
Abstract: Availability and capacity along with functionality are the major keys for success of the division infrastructure of the Swiss Federal Railways SBB. With the installation course of the "value of time" VoT a meaningful and objective instrument is creates, in order to quantify the availability and the capacity for the calculation of the Life Cycle Cost. There are two kinds of VoT: - Planned non-availability (investments-projects or maintenance-work) and therefore reduction of capacity ("value of capacity") - Unplanned non-availability, breakdown and work to restore service ("value of availability") This goes beyond the usual purely qualitative view added to the quantitative hard-facts of investment cost. With the definition of a value for one hour of downtime of one track a comprehensible comparison is enabled in a simple an practicable way. As base for decisions in the product management / systems engineering and with innovations projects these values supply necessary assurance. The used values in CHF are verified constantly on the basis examples. For specific parts of the network adapted costs can be used, in order to illustrate e.g. a particularly high density of traffic or to justify the specific us of high performance systems according to the density.
URI: https://digitalcollection.zhaw.ch/handle/11475/15359
Fulltext version: Published version
License (according to publishing contract): Licence according to publishing contract
Departement: School of Engineering
Organisational Unit: Centre for Aviation (ZAV)
Appears in collections:Publikationen School of Engineering

Files in This Item:
File Description SizeFormat 
Steinegger_WCRR2003 708-715.pdf4.31 MBAdobe PDFThumbnail
View/Open
Show full item record
Steinegger, R. (2003). Infrastructure asset management: better decision making by using “Value of Time” [Conference paper]. Congress Proceedings, Abstract No 16.4, 708–715. https://doi.org/10.21256/zhaw-3478
Steinegger, R. (2003) ‘Infrastructure asset management: better decision making by using ‘Value of Time’’, in Congress Proceedings. WCRR, pp. 708–715. Available at: https://doi.org/10.21256/zhaw-3478.
R. Steinegger, “Infrastructure asset management: better decision making by using “Value of Time”,” in Congress Proceedings, 2003, vol. Abstract No 16.4, pp. 708–715. doi: 10.21256/zhaw-3478.
STEINEGGER, Rolf, 2003. Infrastructure asset management: better decision making by using „Value of Time“. In: Congress Proceedings. Conference paper. WCRR. 2003. S. 708–715
Steinegger, Rolf. 2003. “Infrastructure Asset Management: Better Decision Making by Using “Value of Time”.” Conference paper. In Congress Proceedings, Abstract No 16.4:708–15. WCRR. https://doi.org/10.21256/zhaw-3478.
Steinegger, Rolf. “Infrastructure Asset Management: Better Decision Making by Using “Value of Time”.” Congress Proceedings, vol. Abstract No 16.4, WCRR, 2003, pp. 708–15, https://doi.org/10.21256/zhaw-3478.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.