Full metadata record
DC FieldValueLanguage
dc.contributor.authorWüst, Raimond Matthias-
dc.date.accessioned2018-12-21T14:43:31Z-
dc.date.available2018-12-21T14:43:31Z-
dc.date.issued2006-
dc.identifier.urihttps://digitalcollection.zhaw.ch/handle/11475/14122-
dc.description.abstractFor any Railway Network, increased operational performance (or reliability) is a paramount, and in terms of cost, the most effective way to find extra capacity. The PULS 90 program of the Swiss Federal Railways intends to use modern communications technology to incorporate individual train driver’s performance into the traffic control loop. In order to achieve this, the fast and comprehensive delivery of on-line “scheduling information” into each train’s driving cab will be required. However, first, the mathematical challenges of achieving almost instantaneous, dynamic slot rescheduling on a large scale must be resolved. The approach taken by the SBB infrastructure division has been to segment the network according to traffic characteristics and to then develop and deploy algorithmic approaches capable of calculating new schedules on demand.de_CH
dc.language.isoende_CH
dc.rightsLicence according to publishing contractde_CH
dc.subjectReal-time reschedulingde_CH
dc.subjectTimetable reliabilityde_CH
dc.subjectTrain controlde_CH
dc.subjectCapacity constraintsde_CH
dc.subject.ddc380: Verkehrde_CH
dc.titleDynamic rescheduling based on predefined track slotsde_CH
dc.typeKonferenz: Paperde_CH
dcterms.typeTextde_CH
zhaw.departementSchool of Engineeringde_CH
zhaw.organisationalunitInstitut für Datenanalyse und Prozessdesign (IDP)de_CH
zhaw.conference.details7th World Congress on Railway Research (WCRR 2006), Montréal, Canada, 4-8 June 2006de_CH
zhaw.funding.euNode_CH
zhaw.originated.zhawNode_CH
zhaw.publication.statuspublishedVersionde_CH
zhaw.publication.reviewNot specifiedde_CH
zhaw.title.proceedingsProceedings of the WCRR 2006de_CH
zhaw.webfeedDigital Mobilityde_CH
Appears in collections:Publikationen School of Engineering

Files in This Item:
There are no files associated with this item.
Show simple item record
Wüst, R. M. (2006). Dynamic rescheduling based on predefined track slots. Proceedings of the WCRR 2006.
Wüst, R.M. (2006) ‘Dynamic rescheduling based on predefined track slots’, in Proceedings of the WCRR 2006.
R. M. Wüst, “Dynamic rescheduling based on predefined track slots,” in Proceedings of the WCRR 2006, 2006.
WÜST, Raimond Matthias, 2006. Dynamic rescheduling based on predefined track slots. In: Proceedings of the WCRR 2006. Conference paper. 2006
Wüst, Raimond Matthias. 2006. “Dynamic Rescheduling Based on Predefined Track Slots.” Conference paper. In Proceedings of the WCRR 2006.
Wüst, Raimond Matthias. “Dynamic Rescheduling Based on Predefined Track Slots.” Proceedings of the WCRR 2006, 2006.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.