Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wüst, Raimond Matthias | - |
dc.date.accessioned | 2018-12-21T14:43:31Z | - |
dc.date.available | 2018-12-21T14:43:31Z | - |
dc.date.issued | 2006 | - |
dc.identifier.uri | https://digitalcollection.zhaw.ch/handle/11475/14122 | - |
dc.description.abstract | For any Railway Network, increased operational performance (or reliability) is a paramount, and in terms of cost, the most effective way to find extra capacity. The PULS 90 program of the Swiss Federal Railways intends to use modern communications technology to incorporate individual train driver’s performance into the traffic control loop. In order to achieve this, the fast and comprehensive delivery of on-line “scheduling information” into each train’s driving cab will be required. However, first, the mathematical challenges of achieving almost instantaneous, dynamic slot rescheduling on a large scale must be resolved. The approach taken by the SBB infrastructure division has been to segment the network according to traffic characteristics and to then develop and deploy algorithmic approaches capable of calculating new schedules on demand. | de_CH |
dc.language.iso | en | de_CH |
dc.rights | Licence according to publishing contract | de_CH |
dc.subject | Real-time rescheduling | de_CH |
dc.subject | Timetable reliability | de_CH |
dc.subject | Train control | de_CH |
dc.subject | Capacity constraints | de_CH |
dc.subject.ddc | 380: Verkehr | de_CH |
dc.title | Dynamic rescheduling based on predefined track slots | de_CH |
dc.type | Konferenz: Paper | de_CH |
dcterms.type | Text | de_CH |
zhaw.departement | School of Engineering | de_CH |
zhaw.organisationalunit | Institut für Datenanalyse und Prozessdesign (IDP) | de_CH |
zhaw.conference.details | 7th World Congress on Railway Research (WCRR 2006), Montréal, Canada, 4-8 June 2006 | de_CH |
zhaw.funding.eu | No | de_CH |
zhaw.originated.zhaw | No | de_CH |
zhaw.publication.status | publishedVersion | de_CH |
zhaw.publication.review | Not specified | de_CH |
zhaw.title.proceedings | Proceedings of the WCRR 2006 | de_CH |
zhaw.webfeed | Digital Mobility | de_CH |
Appears in collections: | Publikationen School of Engineering |
Files in This Item:
There are no files associated with this item.
Show simple item record
Wüst, R. M. (2006). Dynamic rescheduling based on predefined track slots. Proceedings of the WCRR 2006.
Wüst, R.M. (2006) ‘Dynamic rescheduling based on predefined track slots’, in Proceedings of the WCRR 2006.
R. M. Wüst, “Dynamic rescheduling based on predefined track slots,” in Proceedings of the WCRR 2006, 2006.
WÜST, Raimond Matthias, 2006. Dynamic rescheduling based on predefined track slots. In: Proceedings of the WCRR 2006. Conference paper. 2006
Wüst, Raimond Matthias. 2006. “Dynamic Rescheduling Based on Predefined Track Slots.” Conference paper. In Proceedings of the WCRR 2006.
Wüst, Raimond Matthias. “Dynamic Rescheduling Based on Predefined Track Slots.” Proceedings of the WCRR 2006, 2006.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.