Please use this identifier to cite or link to this item: https://doi.org/10.21256/zhaw-4956
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHollenstein, Lukas-
dc.contributor.authorLötscher, Adrian-
dc.contributor.authorLuccarini, Fabian-
dc.date.accessioned2018-10-25T12:36:18Z-
dc.date.available2018-10-25T12:36:18Z-
dc.date.issued2018-
dc.identifier.isbn978-3-901608-12-4de_CH
dc.identifier.urihttps://digitalcollection.zhaw.ch/handle/11475/12128-
dc.descriptionhttps://www.asim2018.de/de_CH
dc.description.abstractPowder coating and paint-spray lines are often complex production plants because of many dynamical dependencies, limited buffer space and sequence dependent changeover times. We have developed a generic simulation and optimization platform that enables the engineers to design more performant and energy efficient facilities and the production planners to increase productivity through simulation-based optimization. The simulation environment builds on a generic modelling library that captures all variations of such facilities. Execuable models are generated automatically from annotated CAD layouts. As a result, the system smoothly integrates with the engineering process. Once the facility is in use, the fully specified virtual plant is used for simulation-based scheduling, employing a combination of a generic priority-based heuristic and a variant of simulated annealing. We discuss how these two aspects of the system render it an important innovation for the painting line industry and show first results from the scheduling system.de_CH
dc.language.isoende_CH
dc.publisherArgesimde_CH
dc.rightsLicence according to publishing contractde_CH
dc.subjectModellierungde_CH
dc.subjectSimulationde_CH
dc.subjectAutomatische Modellerzeugungde_CH
dc.subjectDomain Specific Languagesde_CH
dc.subjectProduktionsplanungde_CH
dc.subjectLackieranlagende_CH
dc.subject.ddc003: Systemede_CH
dc.subject.ddc670: Industrielle und handwerkliche Fertigungde_CH
dc.titleSimLack: simulation-based optimization and scheduling of generic powder coating linesde_CH
dc.typeKonferenz: Paperde_CH
dcterms.typeTextde_CH
zhaw.departementLife Sciences und Facility Managementde_CH
zhaw.organisationalunitInstitut für Computational Life Sciences (ICLS)de_CH
zhaw.publisher.placeWiende_CH
dc.identifier.doi10.21256/zhaw-4956-
zhaw.conference.details24. Symposium Simulationstechnik (ASIM 2018), Hamburg, Deutschland, 4.-5. Oktober 2018de_CH
zhaw.funding.euNode_CH
zhaw.originated.zhawYesde_CH
zhaw.pages.end50de_CH
zhaw.pages.start45de_CH
zhaw.parentwork.editorDeatcu, Christina-
zhaw.parentwork.editorSchramm, Thomas-
zhaw.parentwork.editorZobel, Kay-
zhaw.publication.statuspublishedVersionde_CH
zhaw.volumeARGESIM Report 56de_CH
zhaw.publication.reviewPeer review (Abstract)de_CH
zhaw.title.proceedingsTagungsband ASIM 2018, 24. Symposium Simulationstechnikde_CH
zhaw.webfeedIndustrie 4.0de_CH
zhaw.webfeedSimulation and Optimizationde_CH
zhaw.webfeedDatalabde_CH
zhaw.funding.zhawGenerisches Simulations- und Planungstool für Lackieranlagende_CH
Appears in collections:Publikationen Life Sciences und Facility Management

Files in This Item:
File Description SizeFormat 
2018_Hollenstein_SimLack_Simulation_based_optimization_and_schedul.pdf246.97 kBAdobe PDFThumbnail
View/Open
Show simple item record
Hollenstein, L., Lötscher, A., & Luccarini, F. (2018). SimLack: simulation-based optimization and scheduling of generic powder coating lines [Conference paper]. In C. Deatcu, T. Schramm, & K. Zobel (Eds.), Tagungsband ASIM 2018, 24. Symposium Simulationstechnik: Vol. ARGESIM Report 56 (pp. 45–50). Argesim. https://doi.org/10.21256/zhaw-4956
Hollenstein, L., Lötscher, A. and Luccarini, F. (2018) ‘SimLack: simulation-based optimization and scheduling of generic powder coating lines’, in C. Deatcu, T. Schramm, and K. Zobel (eds) Tagungsband ASIM 2018, 24. Symposium Simulationstechnik. Wien: Argesim, pp. 45–50. Available at: https://doi.org/10.21256/zhaw-4956.
L. Hollenstein, A. Lötscher, and F. Luccarini, “SimLack: simulation-based optimization and scheduling of generic powder coating lines,” in Tagungsband ASIM 2018, 24. Symposium Simulationstechnik, 2018, vol. ARGESIM Report 56, pp. 45–50. doi: 10.21256/zhaw-4956.
HOLLENSTEIN, Lukas, Adrian LÖTSCHER und Fabian LUCCARINI, 2018. SimLack: simulation-based optimization and scheduling of generic powder coating lines. In: Christina DEATCU, Thomas SCHRAMM und Kay ZOBEL (Hrsg.), Tagungsband ASIM 2018, 24. Symposium Simulationstechnik. Conference paper. Wien: Argesim. 2018. S. 45–50. ISBN 978-3-901608-12-4
Hollenstein, Lukas, Adrian Lötscher, and Fabian Luccarini. 2018. “SimLack: Simulation-Based Optimization and Scheduling of Generic Powder Coating Lines.” Conference paper. In Tagungsband ASIM 2018, 24. Symposium Simulationstechnik, edited by Christina Deatcu, Thomas Schramm, and Kay Zobel, ARGESIM Report 56:45–50. Wien: Argesim. https://doi.org/10.21256/zhaw-4956.
Hollenstein, Lukas, et al. “SimLack: Simulation-Based Optimization and Scheduling of Generic Powder Coating Lines.” Tagungsband ASIM 2018, 24. Symposium Simulationstechnik, edited by Christina Deatcu et al., vol. ARGESIM Report 56, Argesim, 2018, pp. 45–50, https://doi.org/10.21256/zhaw-4956.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.