Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Heitz, Christoph | - |
dc.contributor.author | Roithner, Tobias | - |
dc.date.accessioned | 2018-04-17T14:01:31Z | - |
dc.date.available | 2018-04-17T14:01:31Z | - |
dc.date.issued | 2007 | - |
dc.identifier.uri | https://digitalcollection.zhaw.ch/handle/11475/5325 | - |
dc.description.abstract | We investigate the temporal behaviour of completion time estimates derived from scheduling algorithms that are based on the set of already known and accepted orders (static job shop problem). In a dynamic job shop environment, these estimates change over time, typically increasing. This leads to a systematic error in the completion time estimation based on static job shop algorithms. We propose an approach for calculating this systematic error. Furthermore, a method for compensating this error is derived. For some simple examples, the theory is worked out and compared with simulation results. In all cases, the estimates based on the static algorithm can substantially be improved. | de_CH |
dc.language.iso | de | de_CH |
dc.rights | Licence according to publishing contract | de_CH |
dc.subject | Manufacturing | de_CH |
dc.subject | Modeling | de_CH |
dc.subject.ddc | 658.5: Produktionssteuerung | de_CH |
dc.title | Estimation of job completion times in a dynamic job shop based on static job shop solution | de_CH |
dc.type | Konferenz: Sonstiges | de_CH |
dcterms.type | Text | de_CH |
zhaw.departement | School of Engineering | de_CH |
zhaw.organisationalunit | Institut für Datenanalyse und Prozessdesign (IDP) | de_CH |
zhaw.conference.details | IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007 | de_CH |
zhaw.funding.eu | No | de_CH |
zhaw.originated.zhaw | Yes | de_CH |
zhaw.publication.status | publishedVersion | de_CH |
zhaw.publication.review | Not specified | de_CH |
Appears in collections: | Publikationen School of Engineering |
Files in This Item:
There are no files associated with this item.
Show simple item record
Heitz, C., & Roithner, T. (2007). Estimation of job completion times in a dynamic job shop based on static job shop solution. IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007.
Heitz, C. and Roithner, T. (2007) ‘Estimation of job completion times in a dynamic job shop based on static job shop solution’, in IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007.
C. Heitz and T. Roithner, “Estimation of job completion times in a dynamic job shop based on static job shop solution,” in IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007, 2007.
HEITZ, Christoph und Tobias ROITHNER, 2007. Estimation of job completion times in a dynamic job shop based on static job shop solution. In: IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007. Conference presentation. 2007
Heitz, Christoph, and Tobias Roithner. 2007. “Estimation of job completion times in a dynamic job shop based on static job shop solution.” Conference presentation. In IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007.
Heitz, Christoph, and Tobias Roithner. “Estimation of job completion times in a dynamic job shop based on static job shop solution.” IFAC Workshop on Intelligent Manufacturing Systems, Alicante, Spain, 2007, 2007.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.