Please use this identifier to cite or link to this item:
https://doi.org/10.21256/zhaw-1896
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sigrist, Jörg | - |
dc.contributor.author | Heitz, Christoph | - |
dc.date.accessioned | 2018-03-28T09:45:17Z | - |
dc.date.available | 2018-03-28T09:45:17Z | - |
dc.date.issued | 2008 | - |
dc.identifier.uri | https://digitalcollection.zhaw.ch/handle/11475/4389 | - |
dc.description.abstract | A new approach for due date assignment in dynamic job shops with priority scheduling is presented. The future temporal development of the production system, eventually determining the flow-time of a job, is governed by both the processing of the jobs already present in the system as well as the processing of future arriving jobs. We combine a simulation-like approach for the already known jobs with a stochastic model describing the influence of future arriving jobs. The resulting model is a hybrid system dynamics model that can be solved numerically, leading to estimates for the flow-time of all available jobs. In a simulation study, we compare the new approach with other popular methods known in literature. Our results indicate that the new method significantly outperforms all other studied methods in terms of accuracy of the estimates, in most cases by at least a factor of two. Furthermore, the effect of priority scheduling can be modelled correctly, yielding good estimates for jobs of different priorities. | de_CH |
dc.language.iso | en | de_CH |
dc.publisher | University of West Bohemia | de_CH |
dc.rights | Licence according to publishing contract | de_CH |
dc.subject | Industrial engineering | de_CH |
dc.subject | Planning | de_CH |
dc.subject | Production | de_CH |
dc.subject.ddc | 338: Produktion | de_CH |
dc.title | Flow-time estimation in dynamic job shops with priority scheduling using a hybrid modelling approach | de_CH |
dc.type | Konferenz: Paper | de_CH |
dcterms.type | Text | de_CH |
zhaw.departement | School of Engineering | de_CH |
zhaw.organisationalunit | Institut für Datenanalyse und Prozessdesign (IDP) | de_CH |
zhaw.publisher.place | Pilsen | de_CH |
dc.identifier.doi | 10.21256/zhaw-1896 | - |
zhaw.conference.details | MITIP 2008, 10th International Conference on the Modern Information Technology in the Innovation Processes of the Industrial Enterprises, Prague, Czech Republic, 12-14 November 2008 | de_CH |
zhaw.funding.eu | No | de_CH |
zhaw.originated.zhaw | Yes | de_CH |
zhaw.pages.end | 160 | de_CH |
zhaw.pages.start | 155 | de_CH |
zhaw.publication.status | publishedVersion | de_CH |
zhaw.publication.review | Not specified | de_CH |
zhaw.title.proceedings | MITIP 2008 : proceedings 10th international conference on the modern information technology in the innovation processes of the industrial enterprises | de_CH |
Appears in collections: | Publikationen School of Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
2008_Sigrist_Flow-time estimation_10th MITIP.pdf | 194.03 kB | Adobe PDF | View/Open |
Show simple item record
Sigrist, J., & Heitz, C. (2008). Flow-time estimation in dynamic job shops with priority scheduling using a hybrid modelling approach [Conference paper]. MITIP 2008 : Proceedings 10th International Conference on the Modern Information Technology in the Innovation Processes of the Industrial Enterprises, 155–160. https://doi.org/10.21256/zhaw-1896
Sigrist, J. and Heitz, C. (2008) ‘Flow-time estimation in dynamic job shops with priority scheduling using a hybrid modelling approach’, in MITIP 2008 : proceedings 10th international conference on the modern information technology in the innovation processes of the industrial enterprises. Pilsen: University of West Bohemia, pp. 155–160. Available at: https://doi.org/10.21256/zhaw-1896.
J. Sigrist and C. Heitz, “Flow-time estimation in dynamic job shops with priority scheduling using a hybrid modelling approach,” in MITIP 2008 : proceedings 10th international conference on the modern information technology in the innovation processes of the industrial enterprises, 2008, pp. 155–160. doi: 10.21256/zhaw-1896.
SIGRIST, Jörg und Christoph HEITZ, 2008. Flow-time estimation in dynamic job shops with priority scheduling using a hybrid modelling approach. In: MITIP 2008 : proceedings 10th international conference on the modern information technology in the innovation processes of the industrial enterprises. Conference paper. Pilsen: University of West Bohemia. 2008. S. 155–160
Sigrist, Jörg, and Christoph Heitz. 2008. “Flow-Time Estimation in Dynamic Job Shops with Priority Scheduling Using a Hybrid Modelling Approach.” Conference paper. In MITIP 2008 : Proceedings 10th International Conference on the Modern Information Technology in the Innovation Processes of the Industrial Enterprises, 155–60. Pilsen: University of West Bohemia. https://doi.org/10.21256/zhaw-1896.
Sigrist, Jörg, and Christoph Heitz. “Flow-Time Estimation in Dynamic Job Shops with Priority Scheduling Using a Hybrid Modelling Approach.” MITIP 2008 : Proceedings 10th International Conference on the Modern Information Technology in the Innovation Processes of the Industrial Enterprises, University of West Bohemia, 2008, pp. 155–60, https://doi.org/10.21256/zhaw-1896.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.